Alter Ego Construction & Interiors logo

In this section

Level 5 Childrens Reception Area GDH

This mini project was part of the overall refurbishment programme for Glasgow Dental Hospital.

Estimated value of Project £100,000.00.

The scope was to upgrade an existing children's receiving reception to a standard which was more welcoming and comfortable for patients but at the same time improve working environment for staff in consideration of patient flow control and observation.

The design opened up a brighter and more colourful softer approach to the whole unit with the introduction of pictorial mural to the children's play area and seating arrangements, which were specifically more pleasing to the eye, covering a range of softer pastel moods which contributed towards the comfortable atmosphere we wanted to create.

Flooring and other cosmetic finishes such as walls were carefully introduced to continue the overall theme.